Residential Complaints and Violations Search Results
Records 1 through 20 of 20
StatusViolation CodeContractorComplaint DateResolution Date
Resolved HOMECRAFT CONSTRUCTION 04/13/05
Complaint: builder would not remove mold and mildew caused by him, builder needs to replace three damaged panels
Resolution:  The Board was told the mold was removed, but ordered Homecraft to repair the three panels and fix a ceiling spot within thirty days, confirmed by inspection, or the matter will be reset for the July hearings.
Resolved COLONIAL CONSTRUCTION COMPANYCOLONIAL CONSTRUCTION COMPANY 04/13/05
Complaint: builder not doing warranty work, builder did not respond to complaint
Resolution:  The Board revoked Colonial's license and issued a civil penalty in the amount of $5,000.00.
Resolved ELLIS & ELLISELLIS & ELLIS 04/13/05
Complaint: poor and incomplete work on remodeling job
Resolution:  The Board assessed a civil penalty in the amount of $1,000.00 and suspended the license for ninety days, to be reviewed at the next hearing.
Resolved BRIGANCE, STACY CONSTRUCTION 04/13/05
Complaint: water leaks and the damage it caused, mold etc...
Resolution:  The Board dismissed the complaint.
Resolved PVS, INC.PVS, INC. 04/13/05
Complaint: poor repaving of a driveway, brown and yellow spots left on driveway and now water backing up in the garage
Resolution:  The Board revoked the license and assessed a civil penalty in the amount of $1,000.00.
Resolved JOHN JOHNSTONJOHNSTON, JOHN 04/13/05
Complaint: while house was being re-roofed, heavy rain caused extensive interior damage, builder has not returned telephone calls or come to fix damage
Resolution:  The Board assessed a civil penalty in the amount of $5,000.00 and revoked the license.
Resolved ABLE CONSTRUCTION COMPANYABLE CONSTRUCTION COMPANY 04/13/05
Complaint: Voss or Able Const. did not respond to a show cause order
Resolution:  The Board assessed a civil penalty in the amount of $1,500.00 and revoked the license.
Resolved COLONIAL CONSTRUCTION COMPANYCOLONIAL CONSTRUCTION COMPANY 04/13/05
Complaint: gross negligence or misconduct
Resolution:  The Board had previously revoked this license. So there is no action to be taken except to dismiss as moot.
Resolved K. V. S., INC. 04/13/05
Complaint: no warranty work done, front door needs replacing, water marks on garage walls
Resolution:  The Board stayed the hearing till July.
Resolved BENJAMIN E. WHITEWHITE, BENJAMIN E. 04/13/05
Complaint: no inspections performed, dangerous wiring left open, did not complete work
Resolution:  The Board assessed a civil penalty in the amount of $500.00 and suspended the license for ninety days.
Resolved Hunter Holding Co., Inc., dba Madison Homes 04/13/05
Complaint: builder will not complete punch list, wrote homeowner a nsf check to cover repairs,
Resolution:  The Board assessed a civil penalty in the amount of $3,000.00 and ordered all repairs to be completed. Failure to pay penalty and complete repairs will result in another hearing in July.
Resolved DISCOUNT BUILDERSDISCOUNT BUILDERS 04/13/05
Complaint: failure to pay subcontractor
Resolution:  The Board stayed hearing till July, pending builder pays the subcontractor.
Resolved Thomas Phillips Painting 04/13/05
Complaint: remodeling without a license
Resolution:  The Board assessed a civil penalty in the amount of $500.00.
Resolved Kevin Todd dba Honey Do, Inc. 04/13/05
Complaint: remodeling without a license
Resolution:  The Board assessed a civil penalty in the amount of $500.00.
Resolved D. Goss Construction 04/13/05
Complaint: contracting to build a new home and not having a license
Resolution:  The Board dismissed the complaint based on contract that stated Goss was only the framer and did not need a license.
Resolved KNIGHT, SEAN S. 04/13/05
Complaint: failure to pay subcontractors
Resolution:  The Board assessed a civil penalty in the amount of $5,000.00, representing ten incidents at $500.00 each, to be paid within thirty days or further action may give merit for further proceedings.
Resolved KENT MARTINEZ CONSTRUCTION 04/13/05
Complaint: inspection done per previous hering
Resolution:  The Board dismissed the complaint based on the follow up inspection report.
Resolved PRINCE, WALLACE L. 04/13/05
Complaint: poor ceramic tile work
Resolution:  At the hearing, the homeowners testified that they are satisfied customers and no longer wish to pursue the complaint. The Board dismissed the complaint.
Resolved CRC HOMESCRC HOMES 04/13/05
Complaint: poor workmanship with bricks, poor framing of house per engineers report,
Resolution:  The Board assessed a civil penalty in the amount of $1,000.00 and suspended the license for ninety days, to be reviewed at the next Board meeting.
Resolved Miss Code Ann. §73-59-13 (1)(c) SANDERS, TIM 11/01/04 04/13/05
Complaint: a black soot-like substance covering the interior of the home; Gross negligence or misconduct Miss Code Ann. §73-59-13 (1)(c)
Resolution: OTHER DISMISSED AFTER HEARING


2019  January April July    October 
2018  February April July    October 
2017  January April July    October 
2016  January April July    October 
2015  January April July    October 
2014  January April July    October 
2013  January April July    October 
2012  January April July    October 
2011  January April July    October 
2010  January February April    July October 
2009  January July October    
2008  January April July    September October 
2007  January April July    October 
2005  April July 
2004  January April July    October 
2003  January April July    October 
2002  April July 
2001  November 
 
Residential Complaints Search Form
Quick Search *
Violation Code
Name
Complaint
Complaint Date
Resolution Text
Resolution Date
Rows Per Page
* Search contractor name or license number.